Skip to content

Engineering & DFM

Custom Shower Door Development, From Drawing to Production

Your design, our engineering. Zenova turns shower enclosure concepts into products that can be manufactured — through design-for-manufacturing review, CAD configuration, 3D modeling, prototype validation and flexible production.

Send us your drawing

Fast development. Flexible production. Reliable delivery.

  1. Your drawing
  2. 24 hours* Configuration drawing + 3D model
  3. 7–30 days Prototype assembly 7 days with stock hardware · 12–15 days with aluminum tooling · 25–30 days with stainless-steel tooling
  4. Mass production
  5. Delivery

*Working days

Customer size drawing for a two-sided hinged shower enclosure, with identifying details removed
Customer drawing (identifying details removed) View full size

Step 01 · Customer design input

Customers send drawings, concepts or market requirements. Our engineers review the structure, dimensions and manufacturing requirements before any configuration work begins.

Zenova configuration drawing with front, side and top views, hardware positions and a bill of materials
Zenova configuration drawing View full size

Step 02 · Engineering configuration & design optimization

Within 24 hours on working days, our engineers complete a detailed configuration drawing: glass dimensions, hardware positions, installation structure and production details.

  • Detailed CAD configuration
  • Hardware position confirmation
  • Installation structure optimization
  • Manufacturing feasibility review
3D illustration of a two-sided hinged glass shower enclosure with dimension lines
Illustration

Step 03 · 3D product visualization

Before a prototype is made, we build a 3D model of the final structure so you can confirm the design details and avoid changes later.

Assembled prototype of a two-sided hinged glass shower enclosure
Prototype assembly

Step 04 · Prototype assembly & validation

With flexible production, we assemble and check the prototype in our plant before production starts. Lead time depends on the parts: 7 days with stock hardware, 12–15 days if aluminum tooling is needed, and 25–30 days for stainless-steel tooling.

  • Prototype assembly
  • Installation check
  • Structural testing
  • Production preparation

Flexible development for different market needs

  1. 01

    Small-batch customization

    Unlike factories built only for mass production, we take on small-batch development for new designs, market testing and custom projects.

  2. 02

    Flexible prototype production

    Verify a new product before you commit to a large order.

  3. 03

    Production scale-up

    After the prototype is approved, we move to stable mass production with consistent quality control.

What to send us

Any of these is enough to start: a CAD file, a PDF or hand sketch, a photo of the space, or a reference product. Tell us the quantity and the market you sell in.

Accepted files: PDF, ZIP, JPG, JPEG, PNG, WEBP, HEIC, STEP, STP, IGS, IGES, DWG, DXF, DOC, DOCX, PPT, PPTX, XLS, XLSX, TXT, RTF, ODT, ODP, ODS, ODG. Up to 50 MB per file.

Have a drawing or a concept? Send it over and our engineers will reply with a configuration drawing within 24 hours on working days.

Send us your drawing

Scroll to Top